8 | INSTALL THE CONNECTING PIPE
6.3.
Pipe size
(Unit: mm)
6.4.1
SBOX pipe size
Model
SBOX01
SBOX
Liquid
Φ9.5
main con-
pipe
nection
High
Φ15.9
pipes
pressure
gas pipe
Low
Φ19.1
pressure
gas pipe
SBOX to
Liquid
Φ9.5
indoor
pipe
unit con-
Low
Φ15.9
nection
pressure
pipe
gas pipe
6.4.2
Indoor unit pipe size
Lower side
Branch pipe side (mm)
indoor unit
Gas pipe
capacity A
(×100W)
22≤A≤45
Φ12.7
45<A≤160
Φ15.9
6.4.
The Procedure of Connecting Pipes
1) Connect the indoor unit first, and then connect the outdoor unit.
a. The pipe bend should be handled carefully, without damaging the pipe and
insulation layer. Ensure once you have installed the indoor unit, cover with
plastic to stop dirt and dust collecting inside the unit. Failure to do so will
cause damage to the unit.
b. Before tightening up the flare nut, apply refrigerant oil at the outer surface of
the pipe. Screw up the nut for 3~4 circles beforehand (see Fig.6-1).
c. Ensure when connecting and disconnecting pipe work, use two spanners
simultaneously.
d. Ensure that you don't over tighten the flare nut. This will deform the
connection pipe on the indoor unit and cause leaks.
2) Ensure when making flare you tape/cover the inlet of the indoor unit, to
ensure no impurities go inside the unit.
6720862460 (16/04)
Table: 6-3
SBOX2 &
SBOX04 &
SBOX06
SBOX02E
SBOX04E
Φ12.7
Φ15.9
Φ15.9
Φ19.1
Φ22.2
Φ22.2
Φ25.4
Φ31.8
Φ31.8
Φ9.5
Φ9.5
Φ9.5
Φ15.9
Φ15.9
Φ15.9
Table: 6-4
Suitable
branch pipe
Liquid side
Φ6.4
IDU-BJ01
Φ9.5
IDU-BJ01
Apply refrigerant oil
Fig.6-1
3) After connecting all the pipe work, ensure you flush the system through with
nitrogen and pressure test according to outdoor installation manual.
i.The bend angle shall not exceed 90°. (See Fig.6-2)
Use a thumb to bend the pipe
Minimum radius 100mm
ii. Where possible use long radius bends to help flow of refrigerant.
iii. Do not bend the pipe more than three times.
When rolling out copper pipe, ensure
there are no kinks or imperfections in
the pipe work.
i. When bending the pipe, measure the pipe length required, mark bend
position and bend with benders.
ii. Longer radius elbows are recommended to help flow of refrigerant.
iii. Always use pipe benders when bending pipe.
2. Fixing pipe work
1) Ensure you use appropriate brackets for supporting pipe work.
2) Ensure the liquid pipe and the suction pipe feeding one unit are bound
together, with the correct cable.
3) When installing pipe work through walls, you need to protect pipe work with