ABB 2 Series Operation And Installation Manual page 80

Table of Contents

Advertisement

"Operation and installation manual" - "Terra 360 Series 2 - CE"
80
11.2 Footprint - Terra 360
The drawing (top view) shows all the necessary measurements to:
• drill the holes to fasten the EVSE to the floor/basement (in yellow)
• prepare the position of the cables in the ground (in blue)
612,9
506
124,5
88
56
52
82
52
134
237
FRONT SIDE
88
52

Advertisement

Table of Contents
loading

This manual is also suitable for:

Terra 360 -ceTerra 60-ce

Table of Contents