Overview
UPS Model
UPS5000-E-128K-HABBS
UPS5000-E-120K-HASBS
UPS5000-E-120K-HLBBS
UPS5000-E-120K-HLSBS
UPS5000-E-120K-HABBS
UPS5000-E-80K-HASBS
UPS5000-E-80K-HABBS
UPS5000-E-40K-HASBS
UPS5000-E-40K-HABBS
UPS5000-E-120K-HABBS
Copyright © Huawei Technologies Co., Ltd. 2019. All rights reserved.
Number
Number of
of
Redundant
Modules
Modules
4
0
4
1
3
0
3
1
3
0
3
1
2
0
2
1
1
0
(1) Power input indicator
(3) Lighting circuit
breaker
(5) IT load 2 circuit
breaker
(7) UPS input circuit
breaker
(9) Control Module (CM)
(11) Filler panel
(13) Monitor display unit
(MDU)
(15) UPS output circuit
breaker
1
Input
Switch
Weight
Type
MCCB
ATS
480 kg
MCCB
ATS
MCCB
450 kg
ATS
440 kg
MCCB
410 kg
ATS
350 kg
MCCB
320 kg
The appearance of the UPS5000-E-128K-
HABBS is similar to that of the UPS5000-E-
120K-HABBS.
The appearance of the ATS for the UPS5000-E-
120K-HASBS and UPS5000-E-120K-HLSBS is
similar to that of the ATS for the UPS5000-E-
80K-HASBS.
The appearance of the MCCB for the UPS5000-
E-120K-HLBBS, UPS5000-E-80K-HABBS and
UPS5000-E-40K-HABBS is similar to that of the
MCCB for the UPS5000-E-120K-HABBS.
Dimensions (H x
W x D)
2000 mm x 600
mm x 1100 mm
(2) Input circuit breaker
(4) Air conditioner circuit
breaker
(6) IT load 1 circuit
breaker
(8) UPS maintenance
bypass switch
(10) Bypass module
(12) Power modules
(14) Power distribution
monitoring board

Advertisement

Table of Contents
loading

Summary of Contents for Huawei UPS5000-E-40 kVA

  • Page 1 UPS5000-E-(40 kVA-128 kVA) Quick Guide (Integrated UPS 2.0) Issue: 04 Part Number: 31507410 Date: 2019-06-28 Copyright © Huawei Technologies Co., Ltd. 2019. All rights reserved. Overview Number Number of Input Dimensions (H x UPS Model Redundant Switch Weight W x D)
  • Page 2 UPS5000-E-80K-HASBS (1) AC transfer switch (2) Lighting circuit (ATS) breaker (3) ATS handle (4) Air conditioner circuit installation slot breaker (5) IT load 2 circuit (6) IT load 1 circuit breaker breaker (7) UPS input circuit (8) UPS maintenance breaker bypass switch (9) CM (10) Bypass module...
  • Page 3: Installing The Ups

    1. Before installation, read the UPS5000-E-(40 kVA-128 kVA) User Manual (Integrated UPS 2.0) to get familiar with UPS information and safety precautions. 2. Use insulated tools during installation and operation. 3. Only engineers certified by the manufacturer or its agents are allowed to perform UPS installation and maintenance.
  • Page 4 Non-Secured Installation 1. Wrench an anchor bolt clockwise to elevate a cabinet , or wrench an anchor bolt anticlockwise to lower it. The cabinet feet can be adjusted within a range of 0–8 mm. 2. To prevent cabinet tilting and damage, adjust all the feet at the four corners instead of one foot. 3.
  • Page 5 (Optional) Installing the Tail Frame 1. Use eight M5 tapping screws to secure the tail 2. Use four M5 tapping screws to secure one frame accessories to the tail frame. upper sealing plate to the tail frame, as shown in the following figure. There are two upper sealing plates, and the one used in this step has a gap.
  • Page 6: Connecting Cables

    5. Install the cabinet rear door and accessories at the corresponding positions on the tail frame. After installing the cabinet rear door, adjust tail frame anchor bolts and ensure that anchor bolts touch the floor. Verify that ground cables are properly connected to the cabinet and cabinet rear door. (Optional) Combining Cabinets The figures are for reference only.
  • Page 7 1. Remove the five rodent-proof meshes and cable hole protection panels from the top of the cabinet, as shown in the following figure. 1. The basic rule for routing cables is: from inside out and from bottom up. 2. You can drill holes in the removed rodent- proof mesh as required before reinstalling 2.
  • Page 8 5. Connect AC input power cables. ATS Input a. Connect two AC input power cables to input b. Take out PC boards from near the input terminals 1L1, 1L2, 1L3, 1N and 2L1, 2L2, copper bar, and install them based on the 2L3, 2N on the UPS cabinet.
  • Page 9 a. Connect output power cables to the b. Connect N cables and PE cables to the N bar customer terminal bars in the UPS cabinet. and PE bar on the left and right sides. (1) IT and air conditioner (2) Lighting output output power cables power cables •...
  • Page 10: Verifying The Installation

    8. Route signal cables. Connect one end of the cable to the FE on the integrated UPS, and connect the other end to any POE port on the smart ETH gateway. Bind cables to the cabinet. The following figure shows cable routing inside the integrated UPS. Smart ETH gateway POE port After signal cable connection is complete,...
  • Page 11 Item Acceptance Criteria Result □ Passed Cables are properly connected according to Correct cable connections □ Failed wiring diagrams. Check that copper busbars are open- □ Passed Copper busbar short circuit circuited using a multimeteror an insulation □ Failed resistance tester. Input and output live wires and neutral wires are correctly connected.
  • Page 12 Item Result □ Yes □ No All circuit breakers are OFF. Short circuit does not exist between phases of the AC input or between □ Yes □ No positive and negative battery terminals. Check this item by using a multimeter. Positive and negative battery terminals are connected correctly.
  • Page 13 The automatic operation will be disabled after the handle is inserted into the switch panel. 5. Modify configurations of the 8D controller. You are not allowed to modify the ATS configurations if not authorized by Huawei engineers. a. Check whether the Power LED and Auto LED...
  • Page 14: Powering On And Starting The Ups

    When the controller is in button mode, do not simultaneously press and hold down the I, II, and O buttons on the controller panel. Ensure that the interval between two commands is 5s at least. If another command is issued before the previous one is executed, the protection fuse (F1) under the electric operation mechanism may be blown.
  • Page 15 • A high or low charging power tends to shorten the battery lifespan, or even damages batteries. If you do not know how to confirm the battery capacity, contact Huawei technical support. • Number of cells indicates the number of 2 V DC cells connected to the UPS. Each cell is 2 V.
  • Page 16 Battery Number of Number of Battery Number of Cells Battery Capacity Specifications Batteries Strings in a String 40 Ah/12 V 40 batteries Three battery strings 40 x 6 = 240 40 Ah + 40 Ah + 40 in series connected in parallel Ah = 120 Ah 100 Ah/12 V 32 batteries...
  • Page 17: Shutting Down The Ups

    9. Turn on UPS output circuit breaker Q3 to supply power to loads. Shutting Down the UPS After the inverter is shut down, the system transfers to the bypass mode if the system bypass operates properly or provides no output for loads if the system bypass becomes faulty. Before you shut down the UPS, ensure that the loads are disconnected to meet any power failure conditions.
  • Page 18 Exporting Alarms to a USB Flash Drive Appendix System Configuration Attributes and Values Item Value Description Rated 110 V/57 V; 115 V/66 V; 120 V/70 V; The default value is 380 V/220 V. Set the operating 208 V/120 V; 220 V/127 V; 230 V/132 parameter based on site requirements.
  • Page 19 System Configuration Attributes and Values Item Value Description –30% to –5% The step increase is ±1%. The Voltage Volt Threshold default settings are –10% for LN 1 Thresholds Min LN 1 –30% to –5% Volt Threshold and LN 2. Set the parameter Min LN 2 based on site requirements.
  • Page 20 Setting BSC Mode 1. Set the master BSC system. On the main menu of the LCDs of the UPS, choose System Info > Settings. Tap Advanced Param. on the Settings screen. On the displayed screen, set BSC mode to BSC master mode. 2.
  • Page 21 Scan here for technical support (carrier): Huawei App Store Scan here for more documents: Support-E Support WeChat You can also log in to Huawei technical support website: http://support.huawei.com/enterprise http://support.huawei.com Huawei Technologies Co., Ltd. Huawei Industrial Base, Bantian, Longgang Shenzhen 518129 People's Republic of China...

Table of Contents