Huawei iSitePower-M Quick Manual page 25

Hide thumbs Also See for iSitePower-M:
Table of Contents

Advertisement

Preparing Cables
7.5
Prepare cables for the parallel box.
No. Cable
AC input power cable from the
1
mains input to the parallel box
Cable from the parallel box to the
2
AC input port of the iSitePower-M
Cable from the AC output port of
3
the iSitePower-M to the parallel box
AC output power cable from the
4
parallel box to the load
Main ground cable of the parallel
5
box
Stripping Length
No. Cable
AC input power cable from the mains
1
input to the parallel box
Cable from the parallel box to the AC
2
input port of the iSitePower-M
Cable from the AC output port of the
3
iSitePower-M to the parallel box
AC output power cable from the parallel
4
box to the load
5
Main ground cable of the parallel box
Type
Outdoor three-core
copper cable (L/N/PE)
Outdoor three-core
copper cable (L/N/PE)
Outdoor three-core
copper cable (L/N/PE)
Outdoor three-core
copper cable (L/N/PE)
Outdoor single-core
copper cable
1
L wire: 120 mm
N wire: 120 mm
PE wire: 140 mm
L wire: 410 mm
N wire: 340 mm
PE wire: 240 mm
L wire: 115 mm
N wire: 220 mm
PE wire: 370 mm
L wire: 300 mm
N wire: 325 mm
PE wire: 580 mm
N/A
24
Conductor
Outer
Cross-Sectional
Diameter
Area Range
2
25 mm
16–26 mm
2
4–6 mm
13.7–16.9 mm
2
4–6 mm
13.7–16.9 mm
2
25 mm
16–26 mm
2
25 mm
8–11 mm
2
L wire: 16 mm
N wire: 14 mm
PE wire: 14 mm
L wire: 12 mm
N wire: 7 mm
PE wire: 7 mm
L wire: 12 mm
N wire: 7 mm
PE wire: 7 mm
L wire: 16 mm
N wire: 14 mm
PE wire: 14 mm
14 mm

Advertisement

Table of Contents
loading

This manual is also suitable for:

Map05a1Mab05b1

Table of Contents