Step 8 – Install Controller
Slide controller into slot in L051C shelf.
Secure controller: Controllers with display snap into the shelf; controllers without display have a thumb screw.
Step 9 – Install Alarm and LAN Cables
Connectors are on rear.
J1-2
Alarms - detachable block - Wire to office alarms and
signals. See Information: Alarm Connections.
J5
LAN - Connect to Ethernet network.
Step 10 – Install 1-Wire Battery Temp and Voltage Monitor per Galaxy Pulsar
Edge Controller Quick Start Guide - Optional
1.
Connect 1-Wire Battery Temp and Voltage Monitor to upper DATA connector of L051C shelf.
Step 11 – Install Rectifiers
Firmly push the rectifier into the rectifier slot.
Tighten the thumb screw until the rectifier is seated.
Note: When installing a rectifier in a powered system the RUN LED on the
rectifier will blink until communication with the controller is
established.
Step 12 – Initial Start Up
Verify that all AC, DC and Alarm connections are complete and secure. Turn on AC input breakers. If there are no
alarms, make required adjustments to the default settings on the controller for this installation.
Step 13 – Configure Controller per Galaxy Pulsar Edge Controller Quick Start
Guide
Verify and edit controller basic configuration parameters per site engineering instructions.