LUNA2000-100KTL-M1 Smart Power Control System
User Manual
4.1.2 Angle Requirements
Figure 4-1 Installation angle
4.2 Preparing Tools
Before installation, the following tools need to be prepared.
Issue 07 (2023-07-15)
NO TE
● Class C environment: Outdoor areas more than 500 m away from the sea. If a site
is near a pollution source, it is 1500–3000 m away from heavy pollution sources,
such as smelteries, coal mines, and thermal power plants; 1000–2000 m away from
medium pollution sources such as chemical factories, rubber plants, and
electroplating factories; or 500–1000 m away from light pollution sources, such as
packing houses, tanneries, boiler rooms, slaughterhouses, landfill sites, and sewage
treatment plants.
● Class D environment: Sea environments or outdoor areas within 500 m away from
the sea. If a site is near a pollution source, it is within 1500 m away from heavy
pollution sources such as smelteries, coal mines, and thermal power plants; within
1000 m away from medium pollution sources such as chemical factories, rubber
plants, and electroplating factories; or within 500 m away from light pollution
sources such as packing houses, tanneries, boiler rooms, slaughterhouses, landfill
sites, and sewage treatment plants.
● Class E environment: Special environments, such as underground or underwater
environments.
Copyright © Huawei Technologies Co., Ltd.
4 Installing the Smart PCS
27