4
System Pressure
4.1
Sealed heating system
This boiler is fitted to a sealed heating system which is pre-pressurised. Your installer will advise you of the minimum and maximum
pressure indicated on the pressure gauge.
▶ Check regularly that the pressure is maintained.
▶ If the pressure gauge reads less than 1 bar then the system requires re-charging.
▶ Contact your installer or maintenance engineer if a permanent significant decrease or increase in pressure is indicated on the
pressure gauge.
The filling method will be one of three types:
•
Optional "Keyless"integral filling link
•
Optional "Keyed" integral filling link
•
An external filling loop, fitted valves and flexible hose.
4.2
Locating the integral filling link
Removing the bottom panel:
1. Pull the catch down.
2. Slide the panel forward and down to remove
Fig. 2
Bottom panel
Fig. 3
Integral filling link location
Greenstar Si Compact
- 6 720 813 279 (2014/09)
ErP
1.
2.
System Pressure
11