Wall preparation
The following diagrams show the wall-mounting jigs which
enable a simple and straightforward method of attaching
the boiler to the wall surface.
All Greenstar wall-mounting jigs have pre-drilled fi xing
points and options that make hanging a Worcester
Greenstar quick and easy.
After fi xing the jig to the wall, the appliance can be lifted
onto the jig and the union connections tightened. The
pipework can be routed behind the boiler without the
need for an additional wall spacing frame.
Greenstar i Junior wall-mounting jig
Greenstar CDi Classic wall-mounting jig
Greenstar CDi Compact and Greenstar Si Compact wall-mounting jig
29