Download Print this page

Advertisement

Quick Links

Sensi+ Quick Start Guide
Unpacking
If you are reading this document, you have already opened the box containing your instrument. While
following the basic safety instructions provided below, proceed with unpacking the content of this box.
Basic Safety
Prior to proceeding with the installation and commissioning of this instrument, make sure to read
and fully understand ALL the information in this Quick Start Guide. If you do not fully understand the
content of this guide, contact qualified personnel for help.
Personnel
WARNING
Only properly certified personnel authorized by the site/plant operator should be
in charge of planning instrument installation, electrical connection, commissioning,
operation and maintenance.
Carefully plan any installation, modification or repair before actually proceeding.
Electrical
WARNING
Do not make electrical connections unless the electrical code designation stamped on the
instrument data plate matches the classification of the area in which you want to install the
instrument. Failure to comply with this warning can result in fire or explosion.
Improper Use
It is prohibited to use the instrument for any of the following, including but not limited to:
• A climbing aid, e.g., for mounting purposes.
• A support for external loads, e.g., as a support for pipes.
• By adding material, e.g., by painting over the name plate, or welding/soldering on parts.
• By removing material, e.g., by drilling the housing.

Advertisement

loading

Summary of Contents for ABB Sensi+

  • Page 1 — Sensi+ Quick Start Guide Unpacking If you are reading this document, you have already opened the box containing your instrument. While following the basic safety instructions provided below, proceed with unpacking the content of this box. Basic Safety Prior to proceeding with the installation and commissioning of this instrument, make sure to read and fully understand ALL the information in this Quick Start Guide.
  • Page 2 Figure 1 Content of the box Misc. Should any part of the package be damaged upon reception, contact ABB customer service as indicated on the last page of this guide. Planning for Installation and Commissioning All personnel participating in the planning, installation, commissioning, and maintenance of the Sensi+ Gas Analyzer must have read and fully understood the following documentation: •...
  • Page 3 Proper planning and preparation will result in detailed documents providing information for: • Physical location and mounting of the instrument • Cabling and communication • Gas sampling and gas connection • Instrument configuration All documents produced during preparation and planning should be available to qualified and authorized personnel in charge of installing and commissioning the instrument, and to the authority having jurisdiction (AHJ).
  • Page 4 We reserve the right to make technical changes or modify the contentsof this document without prior notice. With regard to purchase orders, the agreed particulars shall prevail. ABB does not accept any responsibility whatsoever for potential errors or possible lack of information in this document.