Attention: For proper cooling and airflow, reinstall the air baffle before you turn on the server. Operating
the server with the air baffle removed might damage server components.
4. Reinstall the top cover. See
5. If the sever was installed in a rack, reinstall the server into the rack. See
page
52.
6. Reconnect the power cords and any cables that you removed.
7. Power on the server and any peripheral devices. See
8. Update the server configuration.
• Download and install the latest device drivers:
• Update the system firmware. See
• Update the UEFI configuration. See
.
dcg_uefi.html
• Reconfigure the disk arrays if you have installed or removed a hot-swap drive or a RAID adapter. See
https://sysmgt.lenovofiles.com/help/topic/lxpm_frontend/lxpm_product_page.html
documentation compatible with your server.
"Install the top cover" on page
http://datacentersupport.lenovo.com
"Update the firmware" on page
https://thinksystem.lenovofiles.com/help/topic/dcg_uefi/overview_
163.
"Install the server to rack" on
"Power on the server" on page
189.
.
Chapter 5
Hardware replacement procedures
48.
.
for the LXPM
165