Dual-Bus System (Ups5000+Other Vendor's Ups) - Huawei UPS5000 User Manual

Optional bsc card
Hide thumbs Also See for UPS5000:
Table of Contents

Advertisement

UPS5000 Optional BSC Card
User Manual

2.3.2 Dual-bus System (UPS5000+Other Vendor's UPS)

Figure 2-4 Appearance
Table 2-2 Product configurations
No.
Name
1
Optional BSC
card
2
BSC card
cable
3
Voltage
sampling
cable
4
Fuse box
5
Cable
6
Single cord
end terminal
7
Phoenix
terminal
Issue 03 (2022-09-16)
BOM
Quantity
Number
03024PHM 1
04096782
1
-
1
25030395
Electronic|Electric Cable, 300 V/500 V, 60227 IEC 53 (RVV), 2 x
1.5 mm
The cable length is determined by onsite requirements.
● The length of the cable that connects the fuse box and the
output sampling terminal of the master system is
determined by onsite requirements.
● If the configured voltage sampling cable is not long
enough, configure a new one that meets the onsite
requirements.
14170097
6
14120129
1
Copyright © Huawei Digital Power Technologies Co., Ltd.
Description
Installed on any UPS in the slave system.
Signal cable between the optional BSC card and
the ECM.
The material (BOM number: 04096782) contains
three cable packages. Only cable package 1 (BSC
Cable) which contains two BSC card cables and
one voltage sampling cable is used.
Connects the optional BSC card and the fuse box.
The cable length is 3 m.
The fuse box should be installed close to the
power supply to be traced. The breaking capacity
of the fuse (400 V AC/1 A) should be at least 20
kA.
2
, Black (2 Cores: Brown, Blue), Dual-Core Cable
The quantity of terminals for preparing the cable
(3) onsite is included.
Configured only when the cable (3) delivered with
the product is not long enough.
2 Product Overview
6

Advertisement

Table of Contents
loading

Table of Contents