Download Print this page

Completing The Installation - Toro 02710 Setup Instructions

32rd mid-size rear-discharge deck
Hide thumbs Also See for 02710:

Advertisement

B.
Install the guard to the traction unit using 2
bolts (M8 x 25 mm), 4 washers (M8–17),
and 2 locknuts (M8) in the lower hole on the
engine frame
C.
Secure the front of the guard to the deck
using the center bolt, washer, and nut you
removed previously
2.
Refer to the Adjusting the Height of Cut section
in the Operator's Manual and check the height
setting of the rear axle depending on what height
of cut is required.
3.
Install the traction wheels to the hubs and secure
with the drive wheel lug nuts; torque the lug nuts
to 122 to 129 N·m.
4.
Lower the unit to the ground.
5.
Center the drive pulley guard on the rear of the
engine frame and install it with 2 carriage bolts
(M10 x 25 mm), heavy washers (M10), spring
washers, and nuts (M10) as shown
Figure 7
1. Carriage bolt (M10 x 25
mm)
2. Heavy washer (M10)
3. Spring washer
6.
Test fit the underside guard and adjust the
position of the drive pulley guard if necessary
(Figure
8).
7.
Install the underside guard and drag shield to
the drive pulley guard and secure them with the
bolts captured in the lanyards on the drive pulley
guard
(Figure
8).
(Figure
6).
(Figure
6).
inFigure
4. Nut (M10)
5. Drive pulley guard
1. Bolt, captured in the
lanyard
2. Underside guard
7.
8.
Adjust the caster position and the blade height
to the correct height of cut; refer to the Adjusting
the Height of Cut section in the Operator's
Manual.
4

Completing the Installation

No Parts Required
Procedure
g237375
1.
Install the deck cover and secure it with the
fasteners removed in step
Machine (page
2.
If the hydraulic pump bypass valve is open,
close the bypass valves, but do not overtighten.
3.
Ensure that all fasteners are correctly tightened
and that all fluid levels are at the correct level.
4.
Start the engine and check the operation of all
controls; refer to the traction unit Operator's
Manual.
5.
Collect all parts and documentation for the
customer. Fill out the warranty and pre-delivery
inspection documentation.
Note:
A warranty registration card needs to be
completed, both for the power unit and the deck.
4
Figure 8
3. Drag shield
6
of
1 Preparing the
1).
g237378

Advertisement

loading

This manual is also suitable for:

0271102712