Testing The Inside Of The Charging Station - Siemens SICHARGE UC Operating Instructions Manual

Table of Contents

Advertisement

10.4 Testing the inside of the charging station

Maintenance interval
Testing every 12 months
WARNING
Qualified electrician
Only a qualified and trained electrician may work on the SICHARGE UC dispenser.
Visual check of the inside
1. Check the charging socket for humidity, dust, and corrosion
2. Check for correct function:
– Relay
– Lights
– Other display elements
Mechanical check of the inside
1. Check the tightness of the connections L1, N, PE
2. Check the tightening torque of 45 Nm of the connections DC+, DC-, PE, and apply sealing paint
3. Check the fixing points of the base plate
Operating Instructions | SICHARGE UC Dispenser UL
99

Advertisement

Table of Contents
loading

Table of Contents