Husqvarna BV 30 Operator's Manual page 8

Table of Contents

Advertisement

a) Attach the square washers (A) with the M12
screws (B). Torque the M12 screws to 80 Nm
with a 18 mm wrench. The square washers and
the M12 screws are supplied with the product.
A
2. Adjust the operation position of the handles.
a) Adjust the handle height with the bottom lever
(C).
b) Adjust the horizontal position of the handles with
the top lever (D).
To adjust the eccentric weight
Adjust the eccentric weight to the length of the beam
and to the concrete slump.
1. Remove the beam. Refer to
product on page 7 .
8
A
B
C
To assemble the
2. Remove the 7 screws and the cover for the eccentric
element.
B
3. Loosen the lock bolt (J) with a hex key.
D
K
4. Turn the eccentric element (K) to adjust the weight.
The table below shows how much the eccentric
element must be turned with different beams and
different concrete slump. There are 4 marks on the
eccentric element, 62%, 75%, 87% and 100%.
Beam
length,
m/ft
1.82/6.0
2.44/8.0
3.05/10.0
3.66/12.0
4.26/14.0
*S1: Lowest water contents in the concrete slump.
**S5: Highest water contents in the concrete slump.
5. Tighten the lock bolt.
6. Install the cover for the eccentric element and the 7
screws.
7. Install the beam.
J
Concrete slump
S1*
S2
S3
N/A
87%
75%
N/A
87%
87%
N/A
100%
87%
N/A
100%
100%
N/A
100%
100%
1294 - 004 - 01.12.2021
S4
S5**
62%
62%
75%
62%
75%
62%
87%
75%
87%
75%

Advertisement

Table of Contents
loading

Table of Contents