UPS5000-H-(1200 kVA-1600 kVA) Quick Guide (100 kVA Power Modules, Three-Phase Three-Wire)
02
Installing Cabinets
2.1
Unpacking
1600 kVA power cabinet 1
2.2
Securing Cabinets
Securing the Cabinets (1200 kVA)
UPS cabinet
unit: mm
A: mounting holes on the channel
steel
B: mounting holes on the floor
•
Installing rectifiers in the inductor cabinet.
•
Rectifiers are delivered separately, and
baffle plates are placed in the fitting bag
of the inductor cabinet.
1600 kVA power cabinet 2 + bypass cabinet/
1200 kVA cabinet
Inductor cabinet
M12 bolt
Spring washer
Flat washer
Concrete floor
Expansion sleeve
Expansion nut
3
Inductor cabinet