Download Print this page

Setting Up The Monitor - Huawei MateView GT User Manual

Hide thumbs Also See for MateView GT:

Advertisement

Setting up the monitor

1
Unpack the cardboard box and place the box horizontally with the arrow on the foam
facing upward. Take the device and foam out of the box and place them horizontally. Take
the base support out of the foam.
For the ZQE-CBA monitor, you also need to connect the base and support with screws.
2
Tilt and insert the upper end of the base support into the slot at the rear of the monitor,
then press the base support downwards until you hear a clicking sound, which indicates
that the base support has been set up correctly.
3
Hold the assembled monitor with both hands and place it on a flat desk. To avoid
damaging the screen, do not press the screen when holding it.
5

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Zqe-caaZqe-cba