Installation Manual – BTS3606A Cabinet Installation
Airbridge BTS3606&3606A CDMA Base Station

Figure 4-12 Grounding busbar

To install the grounding busbar, proceed as follows:
1)
Loosen the fastening screw on the two ends.
2)
Strip the shielded cable and put it in relevant slot.
3)
Fasten the screws on both ends.
4)
Tighten and press the screws on the corresponding slot.

4.3.4 Using 12-Core Fiber Fusing and Distributing Assemblies

Figure 4-13 shows the 12-core fiber fusing and distributing assemblies, including:
One optical fiber fixture
One 12-core optical fiber fusing box
One 12-core optical fiber adapter installation support
Two semi-circular fiber management tray
(1) 12-core optical fiber adapter installation support
(3) Optical fiber fixture

Figure 4-13 Structure of 12-core fiber fusing and distributing assemblies

Chapter 4 Installing Outdoor Transmission and
(4) Semi-circular fiber management tray
Huawei Technologies Proprietary
4-10
Power Interface Boxes
(2) 12-core optical fiber fusing box

Hide quick links: