4 INSTALLATION OF EQUIPMENT

4.1 UNLOADING AND INSPECTION

There are restrictions on the lift points of the machine. In order to prevent injury or damage to the machine,
use only the methods shown in this manual. It is important that the machine is lifted directly under the
frame as shown.
Some parts of the Wood Runner have a high center of gravity while being moved and could present a tipping
hazard.
Always use caution when unloading. Keep all personnel clear to prevent injury. Damage to airlines and conduits
must be avoided while unloading. Never install the Gantry onto the Runway before the Runway is bolted down.
The Gantry may tip over causing severe injury or death.
Lift Point on Runway

4.2 SITE REQUIREMENTS

 PNEUMATIC REQUIREMENTS: 100 PSI (max 120PSI) at 20 SCFM (average). Minimum airline feed
size: ½"diameter
 ELECTRICAL REQUIREMENTS: 208-230 volts 3Phase 50/60Hz 20 amps or 460 volts 3 phase 50/60 Hz
20 amps. Voltage must be specified at time of order.
 ENVIRONMENT: The machine must be installed within a building to provide weather protection.
Intense sunlight, precipitation or windblown dust will cause malfunction and dramatically shorten
the life of the machine. A heated building is required in colder climates. Moisture and condensate