12 EN - Quick installation and start-up guide
PE
PE
EN
HI
80 Electrical installation
5. Connect the input power cable as follows:
5. Connect the input power cable as follows:
•
Connect the twisted shield of the cable to the grounding terminal (5a).
•
Connect the twisted shield of the cable to the grounding terminal (5a).
•
Connect the phase conductors of the cable to the L1, L2 and L3 terminals.
•
Connect the phase conductors of the cable to the L1, L2 and L3 terminals.
5a
•
Tighten the screws to the torque given below:
•
Tighten the screws to the torque given below:
Frame size
L1. L2. L3
6. Connect the braking resistor cable as the motor cable in step 4.
7. Ground the shield 360 degrees (6a).
8. Connect the twisted shield to the grounding terminal (6b) and the conductors to
6. Connect the braking resistor cable as the motor cable. See step 3.
the R+ and R- terminals (6c).
7. Ground the shield 360 degrees (6a).
6a
9. Tighten the screws to the torque given below.
5b
R0...R1
N·m
Frame size
0.5...0.6
L1, L2, L3
6c
6b
R2
lbf·ft
N·m
lbf·ft
R0...R1
0.4
1.2...1.5 0.9...1.1
N·m
lbf·ft
0.5...0.6
0.4
R2
N·m
lbf·ft
1.2...1.5
0.9...1.1