Huawei DBS3900 LTE Installation Manual page 51

Remote radio unit
Hide thumbs Also See for DBS3900 LTE:
Table of Contents

Advertisement

RRU3260
Installation Guide
Figure 7-1 Hoisting the RRU onto the tower
(1) Lifting sling
1.
2.
Issue ()
After climbing up to the tower, installation engineer A secures the fixed pulley to the tower
platform support and leads the lifting sling through the fixed pulley.
Installation engineer C binds the RRU mounting kits properly using a lifting sling, as shown
in
Figure
7-2, and binds the RRU using a lifting sling and a traction sling, as shown in
Figure
7-3.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
7 Hoisting an RRU and Related Cables onto a Tower
(2) Fixed pulley
(3) Traction sling
43

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dbs3900Rru3260

Table of Contents