Download Print this page

Main Supply Connection - Pioneer 3CB100 Series Installation Manual

Two handle lavatory faucet

Advertisement

Connect the faucet shank to inlet supply lines (N). Connect the supply stops
(O) to the inlet supply lines (N) (left is hot water supply and right is cold water
supply). Make sure inlet supply lines (N) are securely tighten. Do not overtight-
en.
Turn on water. Check for any leaks. Make sure all the connections are secure.
Remove aerator (P).
Open the handle.
Flush and allow water to run at full flow for at least one minute.
Replace aerator (P).
For more care information or trouble shooting inquiries about your
Pioneer product, please see the contact information on the back page.

Main Supply Connection

5

Advertisement

loading

This manual is also suitable for:

3cb101 series3pr100 series3am100 series3br100 series3br110 series3br130 series ... Show all