Reinstate Panasonic AccuPulse Tools On Applications
1. Look Up Application Setting On Worksheet
Worksheet – Look up the application information on the "Panasonic Assembly Tool Set Up Worksheet".
•
2. Set Up Tool
Obtain Tool & Attachments – Obtain the tool, extensions and sockets for the application.
•
Program The Tool – Referring to the worksheet, program the tool to the same settings as recorded
•
previously confirming the Flush Point (L1-L7) & Program Setting (1-40)
3. Verify The Tool In The Calibration Lab – Update Worksheet
Set Up Transducer – Set up the Analyzer/Software per the settings recorded in the worksheet.
•
Adjust Simulator – Adjust the Joint Simulator per the recorded washer thickness in the worksheet.
•
Transducer – Warm up the Joint Simulator and Tool before testing. Run 10 cycles on the joint simulator
•
to get the components warmed up and grease moving.
Run The Tool – Run the tool on the Transducer with the Joint Simulator.
•
4. Run The Tool On The Application – Update Worksheet
•
Run The Tool - Run the tool on the application and be sure to hold the trigger until the tool shuts off.
•
Audit The Fastener - Conduct a static/residual audit of the fastener to verify accuracy.
Adjust Torque - If the torque is out of specification, adjust the tool's Program Setting (1-40) to increase
•
or decrease the torque until the residual audit is within specification.
5. Record / Tool History
Worksheet – Update the worksheet with the above information if any changes were made to the tool,
•
settings or attachments.
•
Wait 10 seconds in between rundowns.
•
If unable to achieve the required specifications, double check the tools set up (settings &
attachments) for any inconsistences.
Panasonic Assembly
Tools Set Up Worksheet
Panasonic Life Solutions Company of America Assembly Tools Division
2 Riverfront Plaza 5
th
Floor Newark, NJ 07102
www.panasonic.com/assemblytools