Preventive And Scheduled Maintenance / Part Replacement; Preventive Maintenance; Parts Replacement - Toshiba 1600EP Series Operation Manual

Battery cabinet system single phase- 8/10/14/18 kva
Hide thumbs Also See for 1600EP Series:
Table of Contents

Advertisement

6.0 Preventive and Scheduled Maintenance / Part Replacement

6.1

Preventive Maintenance

Toshiba's 1600 Plus Series of UPS battery cabinets have been designed to provide
years of trouble-free operation requiring a minimum of preventive maintenance.
The best preventive measure that the battery cabinet user can take is to keep the area
around the unit, particularly the air inlet vents, clean and free of moisture and dust
accumulations. If the atmosphere of the installation site is very dusty, use a vacuum
cleaner to periodically remove dust accumulations from the air inlet vents. Schedule
authorized service centers to perform internal parts inspections annually.
CAUTION
WARNING
6.2

Parts Replacement

The following list shows intervals for periodic maintenance and replacement of certain
UPS parts.
1) Batteries: VRLA batteries are maintenance free with respect to
Monthly Maintenance
Semi-Annual maintenance
TOSHIBA
Before performing any maintenance, the technician should become
familiar with and follow the important safety instructions located on
pages 3, 5 and 6.
Proper maintenance of the battery system of this unit by a qualified service
technician is essential to the safety and reliability of your battery cabinet
system. Refer to service manual.
electrolyte only. The charging voltage, temperature, performance and
connection resistance must be checked periodically. Necessary
corrective actions must be made in order to assure safe reliable power is
supplied by the battery cabinet. The aforementioned items affect the life
of batteries, so replacement should be once every 3 to 5 years as a
minimum. All of the batteries must be replaced at the same time.
A. Visual Checks
1) Leakage
2) Corrosion on positive terminal
B. Check battery temperature at the negative terminal
C. Measure and record the system float charging voltage.
D. Measure and record the individual unit's float charging voltage.
A. Repeat the monthly checks.
B. Perform a 10-second high rate (e.g. 100 amp) load test on the
individual batteries.
C. Re-torque all inter-battery connecting hardware (if applicable).
D. Perform inter-battery connector resistance checks.
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ue31-bc-1825

Table of Contents