8.2 S2 trip unit functional test

1
Prior to operate and / or carry out any replacements on the CB, this must be open, with discharged spring and
disconnected
2
Remove the Trip unit ( DUT ) from the CB following the instructions in the installation manual of the CB n°
600600.002.
3
Take note of the settings present on the trip unit ( DUT ); these settings must be reset after the test.
4
Do not disconnect the trip coil from the Trip Unit ( DUT ).
5
Set the current and time values for the protection available on the DUT.
6
Connect the extension cable to TS3.
7
Connect the S2 test cable to the extension cable.
8
Connect the S2 test cable the DUT.
9
If it is present G module, before testing L,S,I protection, remove G module and insert the bypass module
10
In order to set parameters and perform the test, follow the instructions in chapters 7.3, 7.4,
11
Verify that the tripping time indicated in the TS3 display is corresponding to the expected one, as indicated in the
technical catalogue n° 6000-3-84.
12
In case of changing of settings , insert the beginning value of threshold and time.
13
Reinsert the G module if has been substituted by the bypass module.
14
Reinstall the trip unit ( DUT ) on the CB as indicated in the instruction manual of the CB n° 600600.002
Example of test:
Current generation on phase L1
Setting on the trip unit for L, S, I, G protections.
Protection
L
S
I
G*
\
Table 9
* See Note4 in chapter
8
NOTA6: The G protection can be verified by current injection on phase L1, L2, L3 only.
888.902.6111
Figure 16
Trip
Curve
threshold
2
t=k/I
I1 = 1In
t=k
I2 = 8In
I3 = 12In
t=k
I4 = 0.5In
TS3
1SDH000670R0002
www.intellirentco.com
|
Expected
Trip time
I test
tripping
time
A
6In
2s
0,6s
10In
0,6s
 60ms
14In
0,5s
1In
0,5s
7.5
L3852
26/44