Huawei Backup Box-B0 Quick Manual page 7

Table of Contents

Advertisement

Installing an Output Power Cable for Off-Grid Loads
3.3
Before installing a cable, open the panel of the Backup Box, route the cable through the off-grid
load port, and connect the cable. After all cables are connected, reinstall the panel.
Off-Grid Load Terminal (X1)
1
2
No..
Single-
L
N
Phase
3.4
Installing a Grid AC Output Power Cable
Connecting Grid AC Terminals ( X2 )
No.
1
Single-Phase
L
3
4
-
PE
2
3
4
-
-
N
Off-Grid Load Terminal (X1)
1
2
No..
L
N
Three-
Phase
X1
5
6
7
-
PE
-
6
3
4
-
PE

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Backup box-b1

Table of Contents