Securing the Equipment
(Only for 30 kW) Install the Air Baffle
3.10
4
Installing Pipes
4.1
Pipe Layout
1. A 1:100 tilt should be reserved for the main drainpipe.
2. Keep a clearance of at least 25 mm between pipes. Secure the pipes to supports every a
certain distance.
3. Clean the water inlet engineering pipes to avoid impurities entering into the humidifier.
4. A reducing valve must be installed if the inlet water pressure exceeds 0.7 MPa.
5. Pipes should be wrapped with thermal insulation foam along the route.