3.8
Securing the Equipment
(Only for 30 kW) Install the Air Baffle
3.10
4
Installing Pipes
4.1
Pipe Layout
1. A 1:100 tilt should be reserved for the main drainpipe.
2. Keep a clearance of at least 25 mm between pipes. Secure the pipes to supports every a
certain distance.
3. Clean the water inlet engineering pipes to avoid impurities entering into the humidifier.
4. A reducing valve must be installed if the inlet water pressure exceeds 0.7 MPa.
5. Pipes should be wrapped with thermal insulation foam along the route.
(Only for 30 kW) Remove two
3.9
rodent-proof kits
5