After routing water pipes, secure them to the refrigerant pipe using cable ties. If the pipes are
routed downwards, not only secure the pipes but also seal the cable hole using firestop putty.
Upward water inlet pipe routing
IT Cabinet
6.2
Installing a Drainpipe
In upward pipe routing, install the check valve, engineering hose, and drainpipe connector by
performing steps 1–3. In downward pipe routing, install the drainpipe connector by performing step 3.
The drainpipe inside the indoor unit should be wrapped with the thermal insulation pipe in accessories.
The drainpipes must have gradients (>1:50), and stagnant water is not allowed.
Converged Cabinet
(1) Drainpipe connector: BSPT 1/2-inch, delivered with the smart
(2) Rigid pipe conversion adapter: BSPP 1/2-inch inner screw thread
(3) Rigid pipe: made of PP-R or other material, engineering
(4) Pagoda conversion adapter: BSPP 1/2-inch inner screw thread to
(5) Hose clamp, delivered with the smart cooling product
(6) Hose: made of EPDM or other material, engineering procurement
Downward water inlet pipe routing
IT Cabinet
cooling product
to rigid pipe connector, engineering procurement
procurement
pagoda connector, engineering procurement