4 Installing the Cabinet on a Concrete Pedestal
Construct the concrete pedestal. Decide the specific method for constructing the concrete pedestal based on the
•
local standards. Ensure the constructed concrete pedestal is horizontal.The horizontal deviation must be within 4 mm.
Cover the sealing material (such as silica gel and grease) onto the cable hole at the bottom of the cabinet to seal the
•
cable hole gap and the gaps among cables.
The cabinet base that contacts with the concrete pedestal must be sealed to prevent moisture air from entering the
•
cabinet.
Constructing the Concrete Pedestal
Expansion bolt hole(for
Outer installation holes)
Expansion bolt hole(for Inner
installation holes)
Installation position for the
battery cabinet
Drilling Holes
Bolt M12 x 60
Spring washer
Flat washer
Expansion tube
Nut
Cabling aperture
(Recommended radius 40 mm)
11
Concrete pedestal
Ground