Zanussi ZBHC8 User Manual And Installation Instruction page 5

Thermo ventilation
Table of Contents

Advertisement

B. Integrated suspended ceiling method
1. Install the main body
Fix the main body to the booms(recommended boom M6, if necessary)
2.Install the exhaust pipe
Use tape or the filling to seal the junction between the exhaust pipe and adaptor.
The exhaust pipe should have the tendency (1 degree to 2 degrees) down
towards outside.
Plastic pipe
Aluminum pipe
3.Install the front cover
a. Open the 4 screw covers, and use 4 screws to fix the front cover and main body.
Please check the following inspection points once above finished:
b. Whether the installation of the front cover is well fixed.
c. Whether any noise or shaken happen during operation.
4.The booms must be in the same level during installation, if there is any difference,
please use the adjustable nuts to do the adjustment.
Nominal 4"
inner diameter>100mm
-04-
1.screw
2.nut
3.washer
4.fixed hole for the machine
5.hooded nut
Tape or fillings
Downdip 1-2
Adjustable nut

Advertisement

Table of Contents
loading

Table of Contents