15-50Kva Anchorage - Standard - Toshiba 4400 Series Installation And Operation Manual

Three phase - 15/20/25/30/50/80/100 kva
Table of Contents

Advertisement

8.4

15-50kVA Anchorage - Standard

Place the UPS in the final installation location.
Extend the threaded leveling feet until all weight has
been removed from the casters and the UPS is level.
.
DETAIL - Load Leveling Foot
Front
Front
Leveling
Feet
Leveling
Feet
Leveling
Feet
20.12 in (511 mm)
32.1 in (816 mm)
FIGURE 8.4: FOOTPRINT FOR 15-30 KVA
FIGURE 8.5: FOOTPRINT FOR 50 KVA USING
USING LOAD LEVELING FEET
LOAD LEVELING FEET
4400 Series Installation and Operation Manual – 64527-008
29