Download Print this page

Samsung MIM-B16N Installation Manual page 10

Pulse input module
Hide thumbs Also See for MIM-B16N:

Advertisement

Installing the PIM
Connecting a Meter, PIM and DMS
Connecting a Meter and PIM
1 . Unfasten the 2 screws on the bottom of the PIM front cover . Hold the bottom
2 sides of the PIM and push downwards to slide open the cover .
2 . Connect the adapter to the power terminal .
- Arrange the adapter as shown in the figure .
3 . Connect PIM and a Meter as many as you want . In this step, use communication
cable and 8 terminal blocks which are attached to the pulse input terminal of
PIM .
- For the communication cable connection instruction of a Meter or additional
setting instruction, refer to the installation manual of a Meter .
- Connect the communication cable considering the polarity . [Left:(+), Right:(-)]
• Maximum 8 meter(Power/Gas/Water) can be connected to 1 PIM .
• Use 2Cx0 . 7 5mm
CAUTION
communication cable .
2
English-10
Adapter
Connect
communication
(+)
(-)
cable
Meter

Advertisement

loading