Huawei FusionModule2000 Installation Manual page 13

Smart modular data center 2000 mmhigh cabinets, dual-row aisle containment, 208 v
Hide thumbs Also See for FusionModule2000:
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Dual-Row
Aisle Containment, 208 V)
Check Item
Power supply
Equipment room fire
extinguishing
Floor drain
Module grounding
Monitoring port
If any of the requirements is not met, contact Huawei technical support.
Issue 01 (2017-07-30)
Requirement
380–415 V AC, 3-phase, 50/60 Hz
Indoor gaseous fire extinguisher
DN50 or larger, made of cast iron or
stainless steel
The equipment room grounding
system must be a TN-S or TN-C-S
system.
The equipment room ground grid
must have a ground resistance of 10
ohms at most (If the ground
resistance exceeds 10 ohms, ensure
that the equivalent ground radius of
the ground grid exceeds 5 m.)
Ground bars must be deployed over
the cable tray or under the raised
floor
One LAN switch Ethernet port:
connects to the customer subnet to
monitor devices inside the module.
(Optional) Two fire control dry
contacts (access actuator and PDC
fire control terminal): connect to the
fire extinguishing system of the
equipment room for interaction.
SIM card: supports 3G (WCDMA)
communication and is compatible
with 2G (GSM) communication. At
least one SIM card is available.
NOTE
The prerequisite for using a SIM card is that
the site has signal coverage.
IP address: At least one IP address
for the ECC collector, the camera,
and the VCN respectively.
NOTE
An IP address is required for each camera.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
1 Installation Preparations
Check Result
□ Compliant
□ Incompliant
□ Compliant
□ Incompliant
□ Compliant
□ Incompliant
□ Compliant
□ Incompliant
□ Compliant
□ Incompliant
4

Advertisement

Table of Contents
loading

Table of Contents