4.2 RATED VOLTAGE FOR EACH PHASE/WIRE SYSTEM ...8 5. POWER METER CONFIGURATION ......8 5.1 DISPLAY AND BUTTON FUNCTION .........8 5.2 POWER METER SETUP AND MENU DIAGRAM ....9 5.3 POWER METER SETUP FOR VOLTAGE AND CURRENT SETUP ..........10 Mitsubishi Electric Automation, Inc.
• This instrument should be installed and used by a qualified electrician. ME96 Series Power Meters are high accuracy meters for electrical load monitoring. ME96 Family meters are panel mount with a large • The instrument must not be powered and used until its definitive LCD display and native Modbus RTU communication.
• Presence of metal fragments or conducting substances n INSTALLATION Please note the following items regarding installation. To ensure safety, installation is to be performed by a qualified technical electrician. • Affix the main unit to the panel before use Mitsubishi Electric Automation, Inc.
0.1VA/phase Consumption and confirm the symptoms. If the problem is not listed, please Aux. Power 7VA (AC110V), 8VA (AC220V), 5W (DC100V) contact Mitsubishi Electric at Amzsupport@meau.com Auxiliary Power AC100-240V (±15%), DC100 to 240V (-30% +15%) Weight 0.5kg Dimension (H x W x D)
To prevent damage to the panel and screws, do not fasten screws too tightly. Recommended torque for these products: 0.3~0.5N·m (approx. half of standard torque) Also, please tighten the upper and lower screws at the same time. Mitsubishi Electric Automation, Inc.
Page 7
100-240VAC or VDC P 3 M A 2 Fuse: 0.5A P 2 M B *1 For low-voltage circuits, secondary-side grounding of instrument-use Protective voltage/current Earthing transformers is not required. *2 Connection to NC terminal Load (−) is prohibited. Mitsubishi Electric Automation, Inc.
The display of Setting mode appears. ■ ■ The display of Set value confirmation ■ mode appears. Fig. 5. Single phase 2-wire (delta) Fig. 6. Single phase 2-wire (star) 5. POWER METER CONFIGURATION 5.1 DISPLAY AND BUTTON FUNCTION 15 14 13 Mitsubishi Electric Automation, Inc.
Set values return to the factory default value. + Press it for 2 seconds. RESET PHASE Blinking ※3.This is not display in Setting Mode. + Shift from the operation mode to the password protectionmode. Press it for 2 seconds. RESET PHASE Mitsubishi Electric Automation, Inc.
Current phase 2 Current phase 1 Current average Active Power (total) Active Power phase 3 Active Power phase 2 Active Power phase 1 Voltage average (between lines) Voltage phase 31 Voltage phase 23 Voltage phase 12 Mitsubishi Electric Automation, Inc.
(detailed version) Closed Closed Opened (Alarm relay contact) and confirm the symptoms. If the problem is not listed, please contact Mitsubishi Electric at Amzsupport@meau.com. ALARM CANCEL n MAINTENANCE/INSPECTIONS If a measurement value falls below an alarm value, alarm is Automatic •...
Please compare instrument (such as measurement instrument the currents using a of the customer. Mitsubishi Electric shall not be liable for: Damage a clamp meter) is used will have a measurement instrument different from the current larger error when the that cannot be attributed to Mitsubishi Electric;...