Maintenance Procedures; Disposal; How To Order Spare Parts - Whirlpool AND 040 User And Maintenance Manual

Ironing table
Table of Contents

Advertisement

15 - MAINTENANCE PROCEDURES

In case of irregularities or malfunctioning, please contact the service technician for the relevant checks.
Periodically, it is necessary to carry out the following operations:
Boiler discharge (*)
Cleaning of the water filter
Cleaning both of boiler and heating elements
Cleaning of the condensation return filter
(*): Discharge the boiler once it has reached 1 bar of pressure, in order to remove any limescale or dirt deposits.
When the machine is switched off, open slowly the gate valve of the boiler exhaust. We recommend to carry out
this operation before you start working and not in the evening at the end of work, as the fresh water streaming into
the boiler is rich in oxygen, increasing during the night the corrosion process inside the drum.
This machine does not require special equipment for check and/or maintenance operations. It is however advisable
to use suitable tools and personal protections in compliance with the Italian law by decree 626/94, which have to be
in good conditions (Presidential Decree 547/55), in order to avoid any damages to persons or machine
components.
Make sure that the power and hidraulic supply are disconnected prior to any maintenance service
and that the whole equipment is cooled down.

16 - DISPOSAL

During the maintenance on the machine, or in case of its scrapping, please dispose carefully and correctly of any
polluting components, according to the local regulations. In case of scrapping, the identification rating plate and any
other document have to be destroyed.

17 - HOW TO ORDER SPARE PARTS

Upon the spare parts request, please quote always:
Machine type, serial number, quantity of the requested spare parts, article number (these data can be read on the
rating plate or supplied by the technical information of the machine and by the user's and maintenance manual).
For electrical components with a different voltage and frequency than V 230-380 50Hz (data available on the rating
plate of the faulty component), specify the right voltage and frequency after having mentioned the article number.
The technical data, the descriptions and pictures included in this manual are not binding. The manufacturer
reserves the right to make any necessary modification without notice or having to up-date the present manual.
OPERATION
10
WORKING HOURS
40
1500
2500
500

Advertisement

Table of Contents
loading

Table of Contents