SUN2000-(8KTL-20KTL)-M2
User Manual
----End
7.1.5 Detect optimizer disconnection
On the SUN2000 screen, choose Maintenance > Optimizer disconnection
detection, tap the detection button to detect the optimizer disconnection, and
rectify the fault based on the detection result.
Figure 7-9 Detect optimizer disconnection
7.2 Parameters Settings
Go to the Device Commissioning screen and set SUN2000 parameters. For details
about entering the Device Commissioning screen, see
To set more parameters, tap Settings. For details about the parameters, see the
FusionSolar APP and SUN2000 App User Manual
to obtain the document.
Issue 01 (2020-07-02)
Figure 7-8 Physical layout design of PV modules
Copyright © Huawei Technologies Co., Ltd.
7 Man-Machine Interaction
B Device
Commissioning.
. You can also scan the QR code
67