Holding Rack; Securing The Holding Rack; Removing The Holding Rack - Miele A 300/2 Operating Instructions Manual

Injector modules
Hide thumbs Also See for A 300/2:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 22
Securing the

holding rack

Removing the
holding rack
Holding rack
An additional holding rack can be mounted when reprocessing partic-
ularly fragile load items. This prevents them from touching each other
if they are moved by the force of water during reprocessing.
The holding racks are tailored to the size of the modules and can be
retrofitted at any time.
 Do not pull on the holding racks or lift the modules by the hold-
ing racks.
The load items could be damaged or the holding racks could come
loose from the modules.
Position the rods of the holding rack on the module with the holders
.
Turn the holders on the rods of the holding rack .
The locking retainers on the holders lock into place .
Repeat the process for the other 3 rods.
Pull the locking retainers on the holders downwards slightly  and
turn the holders .
Repeat the process for the other 3 rods.
Lift the holding rack off the module .
en - Installation
33

Advertisement

Table of Contents
loading

This manual is also suitable for:

A 300/3A 301/4A 301/5A 302/2A 302/3

Table of Contents