Mitsubishi Electric MELSEC Q Series Reference Manual page 147

Q corresponding melsecnet/h network system
Hide thumbs Also See for MELSEC Q Series:
Table of Contents

Advertisement

4
SETTING AND PROCEDURE BEFORE OPERATION
Turn OFF the power.
Insert the plug by aligning the groove of
the plug with the projection of the jack.
Rotate the plug in the direction of the
arrow (clockwise) securely to the position
shown in the second figure from above.
Turn OFF the power.
Rotate the plug in the direction of the
arrow and unhook it.
Hold the plug by hand and pull it out in
the direction of the arrow as shown in
the bottom diagram.
4 - 27
(b)
Installing the coaxial cable
The following are how to install the coaxial cable:
Installation
Complete
(c)
Removing the coaxial cable
The following are how to remove the coaxial cable:
Removal
Complete
Jack
Plug
Groove
Plug
MELSEC-Q
Network module
Projection
Network module
4 - 27

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents