PowerCube 5000 (SUN2000-150KTL-S0)
Installation Guide
4.
Figure 3-10 Drilling a hole and installing an expansion sleeve
(1) M12 bolt
(4) Expansion sleeve
Step 5 Install the isolation transformer.
Issue 03 (2020-04-10)
Remove the expansion bolt, spring washer, and flat washer.
Copyright © Huawei Technologies Co., Ltd.
(2) Spring washer
(5) Expansion nut
3 Installing the Cabinet
(3) Flat washer
(6) Concrete floor
28