Power-up routine

Make sure the power at the wall connection point is switched ON.

Wired connection

1)
Either position the ADTS Touch on the docking connector of the ADTS, or connect the ADTS
Touch to the ADTS using the umbilical cable connector.
2)
Set the On/Standby Switch on the front of the ADTS to ON.
The test set performs a self test, resulting in a test set status indication Pass or Fault
No LEDs
Yellow
Green (flashing)
Green
Red
Table 3-1: Test set status indications
If the self test fails (red Fault indication), or for any other reason the test set is considered to be
unserviceable, contact GE and return the test set to the GE or GE approved service centre.
K0553 Revision D
Test set status indications (4a):
OFF
Standby
Self test in progress
Pass
Fault
34
P
-
OWER
UP ROUTINE