Step 17: Reinstall The Power Wiring; Step 18: Reinstall The New Control Cable - ABB ACH400 Series Retrofit Manual

Hvac drives. vertical electronic bypass to e-bypass, 1 - 25hp @ 208v, 1 - 50hp @ 480v (r1 ... r4 frame size drives)
Hide thumbs Also See for ACH400 Series:
Table of Contents

Advertisement

Step 17: Reinstall the Power Wiring.

!
Important: Be careful that no loose strands are created when inserting
the wires into the terminal block.
Reconnect ac input leads at terminals U1, V1 and W1.
Reconnect motor leads at terminals U2, V2 and W2.
Reconnect the green/yellow ground lead at terminal PE.
!
Important! Because of the difference in ground terminal design, the
green/yellow wire may have been stripped deeper than is necessary for the ACH550. It may be
necessary to trim the end of the conductor for proper insertion into the new terminal.

Step 18: Reinstall the new control cable.

!
Important: Be careful that no loose strands are created when inserting
the wires into the terminal block.
Locate the new control cable supplied with the new drive. This cable
is a multi-conductor cable with a black sheath. The end for the bypass
unit is labeled "2PCB.X2" and has the shorter wires extending.
Reconnect the color coded wires on both ends according to the table
below.
Bypass Unit Terminal
Terminal 7
--
Terminal 8
Terminal 9
--
Terminal 10
--
--
Terminal 14
Terminal 1
--
Terminal 11
Terminal 1
Color
Green
Blue
Violet
Gray
Orange
Red
White
Black
ACH550 Terminals
Terminal 10 (+4V)
Terminal 11 to Terminal 1
Terminal 1 (Dig In 1)
Terminal 14 (Dig In )
Terminal 15 (Dig In )
Terminal 16 (Dig In 4)
Terminal 17 (Dig In 5)
Terminal 18 (Dig In 6)
Terminal 19 (RO1 Com)
Terminal 0 (RO1 N.C.)
Terminal 1 (RO1 N.O.)
Terminal 5 (RO Com)
Terminal 6 (RO N.O.)
X
15

Advertisement

Table of Contents
loading

Table of Contents