4. Read the notes and then close the window by clicking on the "Close" button.
5. In the "Assume control priority" window, click on button "Accept".
6. Click on button "LM" (Line Module).
7. Activate the check box "Enable signals".
Getting Started
Getting Started, 11/2009, 6SL3097-4AG00-0BP0
Another window containing the safety notes is displayed.
The window is closed and the control panel is activated.
The infeed charges the DC link. A window with progress bar indicates the charging
status. The drive is enabled as soon as the DC link is fully charged. The check box
"Enables" then becomes available for selection.
Buttons "I" and "0" become available for selection.
Commissioning a drive
29