Demolition Hammer Safety Warnings; Specifications; Standard Accessories; Prior To Operation - Hitachi H 25PV Handling Instructions Manual

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 5
English

DEMOLITION HAMMER SAFETY WARNINGS

1.
Wear ear protectors.
Exposure to noise can cause hearing loss.
2.
Use auxiliary handles, if supplied with the tool.
Loss of control can cause personal injury.
3.
Do not touch the bit during or immediately after
operation. The bit becomes very hot during
operation and could cause serious burns.
4.
Before starting to break, chip or drill into a wall,
floor or ceiling, thoroughly confirm that such items
as electric cables or conduits are not buried inside.

SPECIFICATIONS

Voltage (by areas)*
Power Input
Full-load Impact Rate
Weight (without cord, side handle)
* Be sure to check the nameplate on product as it is subject to change by areas.

STANDARD ACCESSORIES

(1) Case ............................................................................. 1
Standard accessories are subject to change without
notice.
OPTIONAL ACCESSORIES (sold separately)
Demolishing
Bull point (Square type) (Round type)
(SDS-plus shank)
Groove digging and edging
Cold chisel (SDS-plus shank)
Cutter (SDS-plus shank)
Grooving
Grooving chisel (SDS-plus shank)
Hammer Grease A
500 g (in a can)
70 g (in a tube)
30 g (in a tube)
5
5.
Wear a mask when turning your head upward.
6.
Properly set the bit holder.
7.
At the start of work, confirm screw tightening.
8.
When working at a highly elevated location, pay
attention to articles and persons below.
9.
Wear protective shoes to protect your feet.
10. Make positively certain that you wear gloves when
engaged in work for a long time since the grip can
become very hot.
11. There is also a risk for a tool to be damaged, and
therefore exercise utmost caution for any possible
fall of the tool when you work at an elevated place.
(110V, 230V, 240V)
500 W*
0 – 3200 min
3.2 kg
Optional accessories are subject to change without
notice.
APPLICATIONS
Demolishing concrete, chipping off concrete, grooving,
bar cutting, and driving piles.
Application examples:
Installation of piping and wiring, sanitary facility
installation, machinery installation, water supply and
drainage work, interior jobs, harbor facilities and other
civil engineering work.

PRIOR TO OPERATION

1. Power source
Ensure that the power source to be utilized conforms
to the power requirements specified on the product
nameplate.
2. Power switch
Ensure that the power switch is in the OFF position. If
the plug is connected to a receptacle while the power
switch is in the ON position, the power tool will start
operating immediately, which could cause a serious
accident.
3. Extension cord
When the work area is removed from the power
source, use an extension cord of sufficient thickness
and rated capacity. The extension cord should be
kept as short as practicable.
4. Installing Tools
CAUTION:
Be sure to switch power OFF and disconnect the plug
from the receptacle to avoid serious trouble.
NOTE:
When using tools such as bull points, cutters, etc.,
make sure to use the genuine parts designated by
our company.
–1

Advertisement

Table of Contents
loading

Table of Contents