Grid-Tied Point Control - Huawei SUN2000 User Manual

Hide thumbs Also See for SUN2000:
Table of Contents

Advertisement

SUN2000-(3.8KTL-11.4KTL)-USL0
User Manual
Figure 7-25 Energy control

7.4.3.4.1 Grid-tied Point Control

Procedure
Step 1 On the Operation console screen, choose Device maint > Energy control > Grid-tied point
control and perform the required operation.
Figure 7-26 Grid-tied point control
Table 7-4 Description of control mode parameters
Parameter
Control mode
Issue 01 (2018-05-21)
Description
If this parameter is set to
Default, the SUN2000
output power is not limited.
The SUN2000 can export its
rated power to the power
grid.
If this parameter is set to
Grid connection with zero
power and the SUN2000 is
connected to a power meter,
the output power of the
SUN2000 is supplied only
to the local load, but not the
power grid.
If this parameter is set to
Power-limited Grid
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
7 Operations on the Local FusionHome App
Value Range
Default
Grid connection with
zero power
Power-limited Grid
Connection
88