Huawei DBS3900 Installation Manual page 102

Icr dual-mode base station
Hide thumbs Also See for DBS3900:
Table of Contents

Advertisement

DBS3900 (ICR)
Installation Guide
Figure 13-9 Installing the AC/DC power system
Step 2 Cut the PGND cable to a length suitable for the actual cable route.
Step 3 Add an OT terminal to each end of the cable according to the instructions in Assembling the OT
Terminal and the Power Cable.
Step 4 Connect the OT terminal (M6) at one end of the PGND cable to the AC/DC power system and
the OT terminal (M6) at other end to the IFS06, as shown in
Issue 12 (2015-04-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
13 Installing Components in the IMB03
Figure
13-10.
97

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents