1MRS756703
3.
3.1.
3.2.
Station Automation COM600
User's Manual
Configuration
About this section
This section guides you in the configuration tasks required before you can start using
the IEC101 OPC Server. For information on the IEC 61850 data modeling, refer to
COM600 User's Manual.
Start SAB600 to open and name a project.
1.
Select File > Open/Manage Project....
2.
In the Open/Manage Project dialog, select the required location for the project:
•
Projects on my computer
•
Projects on network
3.
Select New Project on the left.
•
Enter a Project Name. The Description is optional.
4.
Click Create.
5.
Click Open Project.
Overview of configuration
Before you can start using the IEC101 OPC Server, build, and configure an object tree
in SAB600 to define the Communication structure.
The possible objects are:
•
Gateway
•
IEC101 OPC Server
•
IEC101 Channel
•
IEC101 IED
•
Logical Device objects
•
Logical Node objects
•
Data objects
Figure 3.2-1 shows an example view of SAB600 including an object tree in the commu-
nication structure on the left and Object Properties window displaying the object properties
on the right.
When configuring OPC servers the following characters cannot
be used in object names: \ ` ' ' #
IEC 60870-5-101
Master (OPC) 3.3
15