Test Run; Caution Before Operation Test; Operation Test Of Water Pipe - LG ARNH08GK3A2 Installation Manual

Hydro kit
Hide thumbs Also See for ARNH08GK3A2:
Table of Contents

Advertisement

Test Run

7. Test Run

Caution before Operation Test

• Check whether water flow is smoothly supplied.
• Check whether the flow switch properly operates.
• Check whether the connection status is good.
• Check whether the power cable and communication cable are completely connected.
• Check whether it is 2.0MΩ or above, when insulation resistance between the terminal block
and ground is measured with DC mega tester (DC 500V).
• Never check insulation resistance for the connector of the control board.

Operation Test of Water Pipe

Category
Status
Flow
Switch
CH14
Error
46 Hydro Kit
Check whether operation of water pipe is normal.
Check for the block inside water pipe.
(Strainer cleaning, valve locked, valve malfunction, air remain-
ing, etc.)
Check problem with flow switch.
(Flow switch disorder, untold operation, disconnection, etc.)
Checkpoint

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Arnh04gk3a2

Table of Contents