Installation Guide
Step 3 Fit the four hooks of the pRRU3901 into the installation kits, as shown in
hooks are properly installed, a slight clack can be heard.
Figure 6-17 Installing a pRRU3901
----End

6.4.5 pRRU3901 Installed on a Plate

If the plate on the ceiling has sufficient load bearing capacity and space installation, the
pRRU3901 can be installed on the plate of the ceiling indoors.
Procedure
Step 1 Determine the position for installing the pRRU3901 based on the construction blueprint and the
space requirements.
Step 2 Place the plate in the installation position against the wall. Then, level the plate and mark the
two anchor points using a marker, as shown in
Issue 08 (2015-01-15)
NOTE
It is recommended that you observe the installation from one side of the pRRU3901 when inserting hooks
into the kits.
NOTE
For pRRU3901 installation space requirements, see Space Requirements.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Figure
6-18.
6 Installing a pRRU3901
Figure
6-17. If the
68

Advertisement

Table of Contents
loading

Table of Contents