Toshiba APG001Z Instruction Manual page 4

Apogee fln option unit
Hide thumbs Also See for APG001Z:
Table of Contents

Advertisement

Wiring
Electrical construction work must be done by a qualified expert.
Connection of input power by someone who does not have expert knowledge may
result in electric shocks or fire.
Turn off input power before wiring.
Wait at least 15 minutes and make sure that the charge lamp (on the inverter unit) is no
longer lit. Otherwise, it may lead to electric shocks.
Mandatory
Tighten the screws on the terminal blocks to the specified torque when connecting
cables to terminal blocks.
Otherwise, it may lead to fire.
Operations
Do not pull on the cable and connector.
It may cause damage or malfunctions.
Prohibited
Use this option under the environment specified in the instruction manual.
Usage under the environment other than them may cause damages or malfunctions or
an accident.
Use an additional safety device with your inverter or system to prevent a serious
Mandatory
accident due to the unit malfunctions.
Usage without an additional safety device may cause an accident.
Set up "Communication error trip function (see below)" to stop the inverter when the
option unit is deactivated by an unusual event such as an operating error, power
outage, failure, etc.
- Network time-out (f832)
(See the VF-PS1 APOGEE
Deactivated option unit may cause an accident, if the "Communication error trip
Mandatory
function" is not properly set up.
Make sure that the operation signals are STOP before resetting inverter's fault. The
motor may suddenly start and that may result in injuries.
Disposal
If you dispose off this unit, have it done by a specialist in industrial waste disposal*.
Improper disposal may result in explosion of capacitors or produce noxious gases,
resulting in injuries.
(*) Persons who specialize in the processing of waste and known as "Industrial Waste
Product Collectors and Transporters" or "Industrial Waste Disposal Persons." If the
Mandatory
collection, transport and disposal of industrial waste is done by someone who is not
licensed for that job, it is a punishable violation of the law (Laws in regard to cleaning
and processing of waste materials).
Notes on operation
Avoid installing in a place where ambient temperature or/and humidity change sharply.
Keep the transmission cable separate from the power cable of the inverter to prevent the
inverter from malfunctioning due to electromagnetic noise.
Ground of SCR terminal on this option at the grounding terminal separated from those of
inverters and motors. It may cause malfunction due to noise.
Caution
Warning
Caution
®
FLN Communication Function Manual for details.)
Caution
Notes
- 3 -
E6581541②

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tosvert vf-ps1Apogee vf-ps1 seriesApogee apg001z

Table of Contents