Figure 10-5 Installing The Pgnd Cable For The Gps Surge Protector - Huawei DBS3900 Installation Manual

Indoor centralized rack (icr) dual-mode base station
Hide thumbs Also See for DBS3900:
Table of Contents

Advertisement

DBS3900(ICR)
Installation Guide

Figure 10-5 Installing the PGND cable for the GPS surge protector

Step 5 Route cables by referring to
Step 6 Use cable ties to bind cables.
Step 7 Label the installed cables by referring to Attaching a Sign Plate Label.
----End
Issue 01 (2011-03-30)
15.1 Cabling
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
10 Installing the GPS Surge Protector
Requirements.
10-3

Advertisement

Table of Contents
loading

Table of Contents