Sharp SJ-F750SP-BK Service Manual page 28

Table of Contents

Advertisement

SJF800SPSL
3. Assembling procedures of R-louver ass'y.
Lr led harness
Lr led pwb ass'y
Al panel
1. Connect Pci indicator harness to
Pci pwb ass'y.
2. Insert Pci pwb ass'y into Led holder.
3. Fix Light guide on Led holder.
4. Stick Al sheet l-guide to Light guide
and Led holder.
5. Stick A-sealer r-lv a to R-louver
insu.
A-sealer r-lv b
Al sheet l-guide
R lamp cover t
LIght guide
Top led pwb ass'y
Led holder
R-louver
Lr led pwb ass'y
Al sheet l-guide
Light guide
Led holder
A-sealer r-lv a
R-louver insu
11 – 4
R-louver insu
Plasmacluster
unit
Pci pwb ass'y
Pci indicator harness
R thermistor
Lr led harness
Pci pwb ass'y
Put the tape which
protruded in the side
Pci indicator harness
Pass the harness
through the hole.
A-sealer r-lv a
>PS<
B886
extention
Stick A-sealer r-lv a to
the bottom side.
(Both right and left side)
A- sealer r-lv a
Led holder
Al sheet l-guide
40 x 90 mm
0~2
Light guide
Standard for affixing of
Al sheet l-guide

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sj-f750sp-slSj-f800sp-bkSj-f800sp-sl

Table of Contents